SANDHU ENTERPRISES

Transition to Sustainable

Transition to Sustainable

Organization

Overview

Our History

Mr. Sherjas Sandhu (Bachelor of Engineering (Computer Science) -2008) is Managing Director. Build “Sandhu Enterprises” from the green field, initially started as a tier 2 vendor of M/s Ashok Leyland subsequently moved to tier-1. Had addition on a few more customers like Voltas, BCH, Delta, Schneider and Luminous

Subsidiaries & Other Entities

We operate our business across India through a network of dedicated Tier-II Suppliers as well as Ware Houses. The main operational hubs are at Rudrapur (India) on given below address

SANDHU ENTERPRISES 

PLOT NO-133/1, FOUZI MATKOTA 

BHURARANI, RUDRAPUR-262153, UTTARAKHAND(INDIA)

 

Innovations

Transition to Sustainable
A strong understanding of customer demands, the emerging economic landscape, combined with a purposeful, agile approach drives our growth. Pushing frontiers to reimagine the future, our Open Innovation regarding Engineering Excellence strategy lead to electrification, connectivity, digital services, IOT, intelligent enterprise, manufacturing, supply chain and sustainability. Building on our engineering and innovation expertise, we enable customers to bring the right as well as enjoyable choice of services to our Society.

Manufacturing Excellence Initiatives

  • Manufacturing Cost Reduction YOY Through:
  • Reduction in Variable conversion cost
  1. Man-power cost reduction by ECRS
  2. Power cost reduction by optimum utilization of equipment’s
  3. Energy & Water conservation activities
  4. Process consumables reduction by 3R activities
  • Reduction in RM Cost by Yield Improvement
  1. Net to Gross ratio improvement in Press Parts
  • Reduction in Maintenance Cost
  1. By converting Highcost spares from TBM to CBM
  2. Robust PM

Quality Excellence Initiatives

  • Quality Improvement Through:
  • Reduction in process variations
  1. Optimizing process parameters
  2. Improving upon Daily IHR
  3. Hardware interlock for welding Process
  4. Prevention and Detection Poka yoke for CTQ parameters
  • Defect phenomenon reduction by
  1. Elimination of A & C Type defects by Corrective, preventive, sustenance & System action
  2. Reduction of B type defects by

a. FTA Analysis.
b. 6W2H Analysis
c. Why – Why analysis

3. IHR reduction by effective 4M1T Analysis.

  • Effective Inspection System
  1. Upgrading Inspector skill by enhancing Knowledge & skill
  2. By introducing Camera based Inspection system
  3. By introducing SPD Dispatch Automation System for prevention of Wrong Supply.
  4. Fire wall Station after PDI for Critical parts

Delivery Excellence Initiatives

  • Delivery Performance Improvement Through:
  • Reduction in throughput time by
  1. Process time reduction
  2. Inspection time reduction
  3. Waiting time reduction
  4. Material movement time reduction
  • On time Delivery
  1. Improve response time for delivery
  2. Turn around time reduction

Digital Excellence Initiatives

  • Present Digital Manufacturing Facility:
  1. APS and GPS Interlock with Process
  2. Digital Ammeter & Voltmeter
  3. Curing oven temperature- range interlocked with conveyor.
  4. Automated PT tank
  5. Biometric Attendance system for Staff
  6. Automated Leakage testing machine linked with Bar code printing machine
  • IT infrastructure:
  1. Advanced Tally system with PP, MM, SD, FI, HR Modules
  • Proposed Digital Manufacturing Facility:
  1. Online Production Monitoring System for real time data capturing & analysis
  2. IOT enabled – process controls
  3. PM Module – Maintenance Management system for real time data capturing and analysis
  4. QMS System for Inward inspection in Tally
  5. IT enabled SCM system
Scroll to Top